CONSTRUCTION OF ELECTRIFICATION SYSTEMS (TRANSFORMER POWER SUBSTATION) ALONG THE HALKALI - ÇERKEZKÖY LINE

Starting Date 2014
Completion Date 2016
Number of Station 7
Line Length Electrification of 87 km Single Line, 105 km Catenary Line in total
Scope Catenary Systems

EXPLANATION
The scope of the project is the establishment of 105 km long (where the 87 km of it is single line) Halkalı-Çerkezköy catenary line. The project will be renovated along the neutral zones between the substations. For the line maintanence, 1 Catenary maintenance vehicle will be procured.