GAZIANTEP LRT, PHASE 1, ELECTRIFICATION, POWER SUPPLY AND TRACTION POWER CONSTRUCTION WORK
Starting Date 2008
Completion Date 2010
Line Length 9500 Metres
Number of Station 13
Scope Desing and Construction of Electro - Mechanical Systems.
EXPLANATION
Gaziantep Light Rail Transportation System Project has two tracks and the total length of the line is 9500 metres and there are 13 at grade stations.
The line stars from Gar station through “Stadium and University” stations and ends at Burç station.