Kirazli 1 - Basak Konutlari 4 Rail System Project and Olimpiyatkoy Connection


Starting Date             : 2010

Ending Date               : 2013

Line Length                : 15.809 Km

Number of Stations    :12

Scope                           : Design & Installation of Electromechanical Systems

 

Kirazli 1 - Basak Konutlari and Connection of Olimpiyat Koy Mass Transport Project is designed as double track and the length of the line is 11.704 + 4.105 = 15.809 Km.

 

Along the line there are 12 stations. The Kirazli 1 - Basak Konutlari line starts from Kirazli, Mahmutbey, Iskoc, İkitelli Sanayi, Basak Konutlari 1 and reaches to Basak Konutlari 4.